Utilities:Materials
New Material Creation
To add a new material:
- Select Materials tab.
- Enter the new material name into Name field (40 characters).
Name in the Marker field is used for entering a Short Material Name for Marker program. It is not a required characteristic and is used when creating a marker name.
- Specify additional parameters of a new material, if necessary, by selecting the following checkdoxes:
- Allow changing of the grainline (nap) direction for all the pieces of the given material in a marker.
- Designer’s attribute settings used for creation of a new marker of the given material (including making one copy of pair pieces, drawing both visible and internal contours, etc.).
- Drawing notches in the markers of the given material.
- Drawing grainline in the markers of the given material.
- Nap attribute settings used for creation of a new marker of the given material (including blocking of pieces rotation out of the grainline (nap) direction in a marker).
- Spacing between pieces in a marker.
In Marker program, you may specify the value of the main spacing and most frequently used spacing values, but these parameters are the same for all the markers. Entering the spacing value in Utilities, you can set the spacing for a specific material.
Setting
means that default spacing values set in Marker program will be used. To enter a specific value, select it from the dropdown list (clicking
). The list includes only the spacing values set on the server (Settings/Markers/Tables tab).
The Material is assigned a Unique Number and an Ordinal Number in the Specification.
WARNING! It is the Ordinal Number in the Specification that specifies the material sequence in the list of pieces displayed and in printed documents such as Specifications or Areas.
Materials Sequence Change
To facilitate selection, the materials are arranged alphabetically in Pieces Parameters window of Constructor program, but in model pieces list displayed in Database Operations window and printed in a Specification and Area documents, the materials are arranged according to their sequence in Utilities program lists.
To change the materials sequence, select the material and move it across the list clicking
and
arrow buttons. To save the material sequence in the list, click
.
In addition, you may highlight the line and move it holding the mouse key pressed.
When the pieces are moved across the list, their Ordinal Number in the Specification is changed respectively and the right-hand part of the window is disabled (all the parameters of the material selected).
Material Removal
To remove the material, select it in the list and click
in the bottom bar.
1) If there are no models the material was used in, the dialog box is displayed:
Clicking Yes, you confirm the material removal from the list; clicking No, you cancel the removal.
2) If there are models and markers the material is used in, it can be removed only after its replacement with any other material in all the respective models.
The window with the list of these models is displayed. The models ticked red include markers.
If such ticked line is selected, the list of the respective model markers is displayed in the right-hand part.
Clicking Replace, you change the material; clicking Cancel, you cancel the material removal.
A dialog box with the replacement materials list for selection is displayed.
Clicking Replace, you change and remove the material; clicking Cancel, you cancel the material replacement and removal.
The material is replaced with the selected material in all the models in the Database and is removed.
WARNING! When a material name is changed in a piece, its markers are destroyed!
To remove the material used in markers, these markers shall be removed manually.
SPECIFIC DETAILS
1) If a replacement material has already been used in the pieces with the same names in the model, the dialog box is displayed. Two equal name pieces of one and the same material are not accepted, therefore, first, change the names of the specific pieces in the list.
2) When removing and searching for materials, it is better to change the list sorting to alphabetic order using the checkboxes under the list of materials. Such sorting option is temporary:
If such sorting is selected, you cannot move the elements across the list.






