Design:General description of program operations
The constructor works with a project in the "Design" program. The project is essentially a certain algorithm of constructing the base framework and a table of the initial data used for its construction. The data table is pre-filled in by the constructor. You can enter individual data inside the project or call them up from the previously created databases of measures. The construction algorithm is formed by the program of the actions that the constructor performs on the screen.
Contents
Creating a New Project
Work in the program begins with creating a new project. To create a new project you have to:
§ Choose the Project / New menu item. A window for entering the project parameters will be displayed on the screen:

1) In the Construction Type field, choose the “Base Construction” type (it is chosen by default), which relates directly to construction of base frameworks. The “Piece”, “Contour Plotting” and “Contour Modification” modes are meant for creating macrocommands in the “Constructor” program.
2) In the Name field, enter the name of the project. It may be any kind of name, but you can’t use quotation marks in it.
3) In the Group field, enter a name that combines several projects into one group on some basis. For example, in the TSNIISHP group all the projects can be combined, which are constructed according to this procedure of constructing. You can enter up to 30 symbols into this field.
Even if the projects are in different groups, their names must not duplicate. A message will be displayed on the screen. Enter a new name for the group project after pressing the ОК button.
4) The Sizes Database switch allows using the previously entered measures database as initial data for the project. For example, the measures database filled in according to the data of OST 17-326-81: “Typical Figures of Women”.

If individual measures are used while creating the project, the switch is not activated, and the initial data are entered inside the project.
5) In case if some part of a previously created project, or the entire project, has to be copied while creating the project, activate the “Copy data from:” option.
There is a possibility to choose one of the previously created projects as a prototype.

During copying of the project the switches become active that determine which part of the project has to be copied. If some element is not required, the relevant item is deselected:

6) For entering the sketches of outer appearance the right part of the window is used.
Here sketches of any format (ВМР, JPG, GIF…) can be used, acquired in any way: from a scanner or from a digital camera, and saved in a file.
Buttons for working with the Outer Appearance window:
- Scan the image
- Scanner settings.
- Read the sketch from the file
- Read the sketch from the buffer
- Save the image in a file
- Record the image in the buffer
- Show the general view of the sketch
- Print the sketch out
§ When the project parameters have been filled in, press the Yes button. The created project will be displayed in the work window of the program immediately, and its name will be written on the upper bar of the window.
The “Initial Data” Table for the Construction
Before starting work you have to fill in the table of data that will be used in the construction (or check them if the data were copied). For this purpose you have to fulfill the “Project / Initial Data” menu item or choose the
command in the button menu on the left. A data entry table consisting of four tabs will be displayed on the screen:

1. Measurement Data – for entering the values of measurement data used in the construction;
2. Increments and Constants – for entering the increments and constant values for the project;
3. Variables – for entering the values obtained by calculation method (formulas);
4. Identifiers – no values are entered in this tab. It allows to view and use the data of the measurements performed in the process of constructing the framework and recorded as variable values.
To go to a certain tab, press the field with its name.
The table is filled in the following way: enter a symbol for the value into the Symbol field, a numerical value or a calculation formula into the Value field, and a definition of the value or a comment into the Name field. To move through the data table, and also to edit the table, you can use these buttons:
- move to top of list;
- move one line up;
- move one line down;
- move to end of list;
- add a new value;
- delete a value;
- transfer a value one line up;
- transfer a value one line down;
For complete view of long text in a line the table cells can be widened by holding the cursor on the cell boundary and shifting it for the desired width.
You can change the initial data of the project, and obtain construction of framework for a different size.
You can fill in the table either “manually”, or using the measures databases from the “Sizes Databases” program (e.g., the database of OST 17-326-81– “Typical Figures of Women”).
To change the measures database of the project, press the
button and choose the relevant database in the list.
ATTENTION: data of another chosen measures database will be read correctly in this project only in case of exact match of all the names of measures in the Sizes Database and the “Initial Data” table of the project.
Data entry from the Sizes Database
When the
command is chosen, the screen will display the window of measures for this sizes database and their values for the chosen size, height and fullness.
Double-click on the appropriate line to choose the measurement data, which will be used in the construction. The lines containing the chosen measurement data are highlighted in color. Double-click on the selected line again to deselect it.

In the lower left corner of the window the following buttons are located:
- Select all the data in the table
- Deselect the selected data completely
- Change of the line size when working with long names. For this purpose you have to move the cursor in the table head, having indicated the window boundary line and extending it, and holding down the left mouse button. After the desired window size is set, release the button.
When you press the Yes button, the chosen values will be entered into the initial data of the project.
If the Sizes Database was used to choose the initial data of the project, then you can enter the relevant values from the sizes database into the initial data with the help of the
selection fields. A size/height/fullness value will be called up:

To confirm the choice, press the
button.
After filling in the table or making any changes or additions to it, press the Yes button to confirm your action, or press the Cancel button to cancel your action.
When the table is being filled in, the program controls repetition of symbols in the Measurement Data, Increments and Constants, and Variables tabs. If a parameter is assigned a symbol that has already been used above, the following message will be displayed:
If it is necessary to work with identical symbols, press the Yes button. In such a case you have to remember that a certain sequence of reading data is set in the program: first the Measurement Data, then the Increments, and then the Variables.
Example: If you enter the waist circumference (Wc) in the Measurement Data and then enter the (Wc + 3) expression under the same name of Wc in the Variables section, then as the result of that we’ll see only the last configuration: (Wc + 3) when commands are performed in the project and when we access the Wc symbol in any initial data, either in the measurement data or in the variables.
|
When working with the “Initial Data” table in a project containing a Sizes Database (where there is a list of symbols), you have to make sure that the symbols added manually and chosen from the Sizes Database (and even those which have not been chosen) do not duplicate!!!
Example: In the Sizes Database chosen for the project there is a symbol in the “Measurement Data” tab: “Vst” for “Nipple point height”. But this value is not relevant for this project, and it was not chosen in the work list. If you add a value manually in the “ Increments and Constants ” tab, e.g. “Collar stand height”, and introduce the same “Vst” symbol for it, the following will happen: During work with this project the information will be read from the chosen Sizes Database, which means that when the collar is drafted, the “Nipple point height” value will be read instead of the “Collar stand height” data!!!
The
button allows you to save data from the table in electronic format (Measurement data, increments, variables, identifiers) with the possibility of printing the data out.
Changing reference data
Working with a Project
The “Design” program consists of two work windows: the window for drafting of construction drawings and the window for work with ready pieces.
The work is done in the window that has been activated by clicking the left mouse button. The window for drafting of a construction drawing is activated automatically at startup of the program.
A construction drawing is drafted in the following way:
1. The starting (initial) point of the drawing is set on the screen.
2. With the use of various construction functions (which will be viewed in detail in the separate Drafting of a Construction Drawing section), such constituent elements of the construction as: straight lines, curved lines, circles, arcs, intervals, and points, are built. All these elements can be built in a defined way: at a certain distance, at a certain angle, and so on. All the line types and points have specific names assigned automatically or set by the constructor.
The point of the work of this program is that all the performed actions are recorded, and an algorithm of drafting of a framework drawing is composed automatically based on these actions. The initial data can be changed in the project at any moment, and the algorithm will repeat the process of construction for a different size. There is also a possibility to view the entire procedure of drafting of a framework drawing stage by stage, and redo some separate operations, then the algorithm will be changed automatically too.
You can compose actual pieces on the base of the framework built of constituent elements of the construction, for this purpose you have to specify, with the help of special functions (read more about this in the Drafting of a Construction Drawing section), the contours of their ready-to-use look, the inner contours and the grains. You can build up a seam on the obtained pieces (these possibilities are described in the Work with Pieces section). This process is remembered too, and a specific algorithm of seam construction is recorded for each piece.
The obtained pieces can be printed out with the use of a printer or a plotter.
Pieces created in the “Design” program can be exported into the main program of the constructor to work with them as with industrial pieces already.
Opening, Copying, Renaming, and Deleting of Ready Projects
1. To OPEN a ready project, choose the “Project / Open” menu items, or choose the
command in the button menu. A query window will be displayed, where you have to:
· Choose the Group, which the project was assigned to when it was created. At that, the list of all the projects in this group will be displayed in the Name window.

§ Click the left mouse button on the line of the required project. A sketch of outer appearance, if one exists, will be displayed on the right, in the outer appearance window.
§ Click the Yes button. The chosen project will be loaded into the work window of the program.
§ You can also choose the project from the list by double-clicking the left mouse button on the relevant line.
To display the drawing of the chosen construction, choose
or fulfill the “Project / Fulfill” menu item. The name of the called-up project, its size, height, and fullness (which are defined in the initial data table) will be indicated in the upper bar.
ATTENTION! To load the project on the screen immediately after it is called up, without the
command of fulfillment, you need to activate the design.png setting (design.png button, GENERAL/Design tab). For this setting to be saved when the program is called up next time, press the button in the Save settings window.
By pressing the design.png button or choosing the “Project / Initial Data” text menu item, you can view the initial data of the construction and make changes to them.
· If the project you are trying to load on the screen is already being worked at, the following message will be displayed:
If you press the Yes button, the project will be loaded on the screen. But in case if the same project is worked at simultaneously at several working places, the last saved version will be preserved in the base.
If you choose the No button, the last loaded project will remain on the screen.
2. To COPY a project, choose the “Project / Save As…” menu item.
At that, the window of the project parameters – the copy – will be displayed on the screen, where you have to enter the Name of the new project and the Group. Then choose which part of the project you want to copy, which exactly initial data are required in this project. If some element is not required, the relevant switch is disabled.
3. To RENAME a project, choose the “Project / Rename” menu item.
At that, the window of the working project parameters will be displayed on the screen, where you have to enter a new name, either for the group only or for the project only, or to rename both parameters:
4. To DELETE a project, choose the “Project / Delete” menu item. A list will be displayed on the screen where you have to choose the required project in the corresponding Group, and press the Yes button.
When a project is deleted, a query will be displayed on the screen where you have to confirm deletion.
The project called up onto the screen at the moment, will not be included in the list for deletion.
If all the projects of a group are deleted, it will disappear from the list automatically.
You can also choose projects by double-clicking the left mouse button.